Project Details: The 16.4 km long road connecting Turkistan International Airport with the city of Turkistan features the first 5 km with four 2×3 lanes, while the remaining 11.4 km consists of a 2×2 lane asphalt platform. On both sides of the 5 km section of the road, there is a 20-meter-wide landscaping, bicycle path, and pedestrian walkway. The road alignment includes 2 two-span bridges. The project was completed by the end of February 2021.
Scope: All electrical works
Location: Turkistan, Kazakhstan
Date: 2021
Employer: YDA Group